MANUFACTURING

Factory capability becomes valuable when the process is visible.

Follow the package from incoming material through fabrication, assembly, inspection, packing and dispatch.

Start a project review

HOW TO READ THIS PAGE

A manufacturing route that buyers can interrogate.

Materials and components

Incoming control

Confirm approved inputs, identity and condition before production release.

Discuss this route →
Fabrication and assembly

Production visibility

Coordinate work instructions, in-process checks and package status.

Discuss this route →
Inspection to dispatch

Release and packing

Record final checks, protection, labels and delivery grouping.

Discuss this route →

REVIEW FRAMEWORK

Evidence before commitment.

Exact systems, performance, price, programme, delivery and warranty are confirmed only after authorised review.

  1. 01

    Material release

    Approved materials and components enter the package.

  2. 02

    Fabrication

    Cutting, machining and preparation follow controlled instructions.

  3. 03

    Assembly

    Frames, glazing and hardware are coordinated by type.

  4. 04

    Inspection

    Defined checks precede packing and release.

  5. 05

    Dispatch

    Units are protected, identified and grouped for delivery.

PROJECT INTAKE

Give us the project basis.
Get a useful next step.

This is not an automatic quotation. It prepares a structured brief for human technical and commercial review.

  • Drawings, BOQ or window schedule
  • Building type and location
  • Quantity and procurement stage
  • Known performance requirements
sales@cavorlen.comWhatsApp +86 133 3119 8918
01 PROJECT BASIS
Procurement stage
No technical, price, programme, delivery or warranty commitment is created by this form.